NumProducts = 4; NumResources = 3; demand = [100.0,200.0,300.0,200.0]; insideCost = [0.6,0.8,0.3,0.4]; outsideCost = [0.8,0.9,0.4,0.7]; consumption = [| 0.5, 0.2, 0.1 | 0.4, 0.4, 0.4 | 0.3, 0.6, 0.2 | 0.4, 0.2, 0.7 |]; capacity = [20.0, 40.0, 40.0];